Post-construction
Post-construction cleaning
The final clean after the trades leave: debris, construction dust, stickers and film on the glass, fixtures, restrooms, and the floors.
This is the handover clean, not a nightly janitorial route. After the trades leave, we take out the debris, then the dust, then the film on the glass, then the floors and the restrooms.
Owners, general contractors, and property managers use it before inspection or move-in. Fully insured.
Scope of work
Request an estimateDebris
- Pick up scraps, packaging, stickers, and loose trash
- Empty every room, closet, and hallway before the detail work starts
Dust
- Wipe doors, frames, cabinets, and counters
- Dust sills, ledges, vents, and the tops of doors we can reach
- Clean inside empty cabinets and the hardware
Glass
- Remove film, labels, and paint spots from interior glass
- Clean door glass, partitions, and mirrors
- Wipe tracks and sills
Floors and restrooms
- Vacuum, then mop or scrub the floors, including the edges
- Clean toilets, sinks, mirrors, and stall doors
- Remove tape and dust from fixtures
Questions
Is this the same as office cleaning?
No. Construction dust, stickers, and film take a separate pass. Nightly office cleaning can start after this one is done.
